中文版 English      
 
News center
Corporate News
Industry News
A subsidiary of Dynamic
   Search engine
Title Text
   New projects
Salvage Project of Helios 3 Wreck
Bid Section I of the Waterway Maintenance Project (Phase 2) for the Puyang River from the Yaogongbu Bridge to Xintingbu, Zhuji City
Relocation Project of Bid Section 1 of the Port for Traffic between Land and Island at Aojiang, Pingyang County
The Wharf at the South Bank and Part of the Revetment Works of Gaoting Central Fishing Harbor at Daishan County
Reinforcement and Modification Project of Guoju Qidu Port
The Shijing Fishery Quay Extension Project for Taiwan use only at Nan’an City
Technical Reforming Project at the Gangzhangwan Passenger Dock at Ningde (water engineering part)
Daqu Grade 1 Fishing Harbor Construction Project at Daishan County
Zhoushan Base Port Project
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D41-D42
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D29
Emergency handling of Daixiang No. 1
Salvage of Taiwanese Wreck
Salvage of Wrecks during Typhoon Period
Salvage of Wreck Ruijiang No. 6
Early Phase Project of Jintang Dapukou Container Dock
Land Formation Project of Zhuangyuan’ao Container Dock in Wenzhou
Cast-in-situ Bored Pile Installation of Aoshan Transfer Base Oil Storage Tank Foundation in Zhoushan under CNPC (China National Petroleum Corporation)
Improvement Project along the East Sea area in Xiamen
Sediment Dredging, Riprap and Accropode Placement Project of Deep Water Channel Improvement Phase III at the Yangtze River Estuary
Improvement Project of a Smelly Black River Channel of Zhangjialu Port in Zhuqiao Town
Xinliuhe Beach Nourishment and Installation of Accropodes of the Submerged Breakwater at Nanshatou Passage
Breakwater Project in the Western Area of Yangshan Deep Water Port
Land Formation Project (Phase I) of Utility Area and Comprehensive Energy Utilization Area of Xiaoyangshan Port
Qingcaosha Reservoir and Water Intake & Transfer Pump Brake Project
East Breakwater and Land Formation Project of Beilun Container Dock Phase IV in Ningbo Port
Breakwater Project of Merchants International Daxie Terminals
Mud Blowing Project of the Pilot Area of Wenzhou High-Tech Industrial Base for Private Economy
Construction Contract Section II of Reclamation in the Southern Part of Leqingwan Port Phase I
Hydraulic Filling Project of Diaolang Reclamation Area in Zhoushan City
Dredging Project of Yangshan Deep Water Port Phase I
2 × 50,000-ton-class General Berth Extension Project of Longkou Port in Shandong Province
100,000-ton-class Channel Project of Longkou Port in Shandong Province
Dredging and Maintenance Project of Beisha Port (from Jianchuan Road Bridge to Estuary of the Huangpu River) under Shanghai Municipality On The Administration Of Waterway Transportation
Dock Dredging (bid section 1) and Waterfront Construction for Yangshan Oil Storage Project
300,000-ton-class Crude Oil Dock Dredging Project of Cezi Isle Oil Depot of Nanjing Oil Transportation Department
Shenjiamen Port Dredging Project (bid section II) of Putuo District, Zhoushan City
Dredging and Maintenance Project (bid section II) of the Yunzaobang Channel (Baoshan Section)
Channel Improvement Project of Shunde Waterway and Ganzhu Waterway in Guangdong Province
Coal Dock Dredging Project of Ningbo Beilun Power Plant
Renovation & Extension Project of Upstream Mooring Dolphins of Huai’an No.1 Ship Lock
Water Engineering Project of Ningbo Maritime Supervision Base under Zhejiang Maritime Safety Administration
Water Engineering Project of Zhoushan Maritime Supervision Base under Zhejiang Maritime Safety Administration
Phase I Project of Dongdian Level-2 Fishing Port at Jinshang Town, Shishi City, Fujian Province
3,000-ton-class Berth Extension Project of Zhoushan COFCO
Outfitting Dock Construction Phase 1 and Approach Bridge Project of Funing Shipbuilding Co., Ltd. in Fujian Province
No.2 Outfitting Dock Project Phase II of Tsuneishi Group (ZHOUSHAN) Shipbuilding Inc. (TZS)
Precast Yard Dock Project of CCCC Third Harbor Engineering Co., Ltd.


Making friends through every single project
     DARUN honour(quality)
   Human resources
 
 
 
   A subsidiary of Dynamic 
Friendly link
Ministry of Transport of the People's Republic of China
Ministry of Housing and Urban-Rural Development of the People's Republic of China(MOHURD)
Water Transport Construction Industry Association
China Dredging Association
Maritime Safety Administration People's Republic of China
Shanghai Maritime Safety Administration
Zhejiang Maritime Safety Administration
Shandong Maritime Safety Administration
 
 
 
7月主要经济数据已出!
   
 
 

        8月15日,国家统计局发布的数据显示,虽然同比增速较上月有所波动,但7月份国民经济保持了稳定恢复。在国务院新闻办公室举行的新闻发布会上,国家统计局新闻发言人、国民经济综合统计司司长付凌晖表示,7月份部分主要指标增速有所放缓,是月度之间的正常波动。根据国家统计局的判断,下阶段,工业运行有望保持总体平稳,制造业、基础设施投资有望持续增长,旅游消费有望持续回暖,电子产品、家居消费有望逐步改善,货物贸易继续保持顺差。


       此外,记者从会上获悉,自8月起,部分统计指标的发布也迎来新变化。其中,自8月份开始,全国青年人等分年龄段的城镇调查失业率将暂停发布,待相关统计方法制度进一步完善后会及时恢复发布。

       7月25日,国际货币基金组织最新的预测将2023年全球经济增速上调了0.2个百分点,至3%。从下半年情况看,全球经济可能好于预期,全球金融市场动荡的局面有所缓解,为我国外贸稳定发展创造有利条件。

 

   
Author〖《证券时报》〗    Date〖2023-08-31〗    Read〖1536〗
 
Sent to friends Sent to friends   Print Preview Print Preview   Go Top Go Top
 
 
 
 
 
 
 
COPYRIGHT©2008  Shanghai Darun Port Construction Group Co.,Ltd    Add:16th floor Jinqiao Buiding, No.1389 Jinqiao Road,Shanghai    Tel:021-58777100
Shanghai Darun Port Construction Group Co.,Ltd    copyright 2008 By Darun.    Statistic: 

工信部备案号:沪ICP备13045817号-1    沪公网安备 31011502002599号