中文版 English      
 
Performances
Terminal projects
Dredging projects
Reclaimed Works
Embankment Projects
Waterway regulation
Foundation treatment
Salvage Projects
Project Highlights
Special collecting
   Search engine
Title Text
   New projects
Salvage Project of Helios 3 Wreck
Bid Section I of the Waterway Maintenance Project (Phase 2) for the Puyang River from the Yaogongbu Bridge to Xintingbu, Zhuji City
Relocation Project of Bid Section 1 of the Port for Traffic between Land and Island at Aojiang, Pingyang County
The Wharf at the South Bank and Part of the Revetment Works of Gaoting Central Fishing Harbor at Daishan County
Reinforcement and Modification Project of Guoju Qidu Port
The Shijing Fishery Quay Extension Project for Taiwan use only at Nan’an City
Technical Reforming Project at the Gangzhangwan Passenger Dock at Ningde (water engineering part)
Daqu Grade 1 Fishing Harbor Construction Project at Daishan County
Zhoushan Base Port Project
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D41-D42
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D29
Emergency handling of Daixiang No. 1
Salvage of Taiwanese Wreck
Salvage of Wrecks during Typhoon Period
Salvage of Wreck Ruijiang No. 6
Early Phase Project of Jintang Dapukou Container Dock
Land Formation Project of Zhuangyuan’ao Container Dock in Wenzhou
Cast-in-situ Bored Pile Installation of Aoshan Transfer Base Oil Storage Tank Foundation in Zhoushan under CNPC (China National Petroleum Corporation)
Improvement Project along the East Sea area in Xiamen
Sediment Dredging, Riprap and Accropode Placement Project of Deep Water Channel Improvement Phase III at the Yangtze River Estuary
Improvement Project of a Smelly Black River Channel of Zhangjialu Port in Zhuqiao Town
Xinliuhe Beach Nourishment and Installation of Accropodes of the Submerged Breakwater at Nanshatou Passage
Breakwater Project in the Western Area of Yangshan Deep Water Port
Land Formation Project (Phase I) of Utility Area and Comprehensive Energy Utilization Area of Xiaoyangshan Port
Qingcaosha Reservoir and Water Intake & Transfer Pump Brake Project
East Breakwater and Land Formation Project of Beilun Container Dock Phase IV in Ningbo Port
Breakwater Project of Merchants International Daxie Terminals
Mud Blowing Project of the Pilot Area of Wenzhou High-Tech Industrial Base for Private Economy
Construction Contract Section II of Reclamation in the Southern Part of Leqingwan Port Phase I
Hydraulic Filling Project of Diaolang Reclamation Area in Zhoushan City
Dredging Project of Yangshan Deep Water Port Phase I
2 × 50,000-ton-class General Berth Extension Project of Longkou Port in Shandong Province
100,000-ton-class Channel Project of Longkou Port in Shandong Province
Dredging and Maintenance Project of Beisha Port (from Jianchuan Road Bridge to Estuary of the Huangpu River) under Shanghai Municipality On The Administration Of Waterway Transportation
Dock Dredging (bid section 1) and Waterfront Construction for Yangshan Oil Storage Project
300,000-ton-class Crude Oil Dock Dredging Project of Cezi Isle Oil Depot of Nanjing Oil Transportation Department
Shenjiamen Port Dredging Project (bid section II) of Putuo District, Zhoushan City
Dredging and Maintenance Project (bid section II) of the Yunzaobang Channel (Baoshan Section)
Channel Improvement Project of Shunde Waterway and Ganzhu Waterway in Guangdong Province
Coal Dock Dredging Project of Ningbo Beilun Power Plant
Renovation & Extension Project of Upstream Mooring Dolphins of Huai’an No.1 Ship Lock
Water Engineering Project of Ningbo Maritime Supervision Base under Zhejiang Maritime Safety Administration
Water Engineering Project of Zhoushan Maritime Supervision Base under Zhejiang Maritime Safety Administration
Phase I Project of Dongdian Level-2 Fishing Port at Jinshang Town, Shishi City, Fujian Province
3,000-ton-class Berth Extension Project of Zhoushan COFCO
Outfitting Dock Construction Phase 1 and Approach Bridge Project of Funing Shipbuilding Co., Ltd. in Fujian Province
No.2 Outfitting Dock Project Phase II of Tsuneishi Group (ZHOUSHAN) Shipbuilding Inc. (TZS)
Precast Yard Dock Project of CCCC Third Harbor Engineering Co., Ltd.


Making friends through every single project
     DARUN honour(quality)
   Human resources
 
 
 
   A subsidiary of Dynamic 
Friendly link
Ministry of Transport of the People's Republic of China
Ministry of Housing and Urban-Rural Development of the People's Republic of China(MOHURD)
Water Transport Construction Industry Association
China Dredging Association
Maritime Safety Administration People's Republic of China
Shanghai Maritime Safety Administration
Zhejiang Maritime Safety Administration
Shandong Maritime Safety Administration
 
 
 
青草沙水库及取输水泵闸工程
   
 

 

【工程简介】青草沙水库作为长江口避咸蓄淡的水源地建设项目,青草沙水库及取输水闸工程位于长兴岛,在国内外都属于罕见的河口江心大型水库,其水库库容5.26亿m3,供水规模719m3/d,总投资约60亿元。是上海市世博会配套工程,总面积近70平方公里,设计总库容为5.24亿m3,有效库容为4.35亿m3,日供水规模为719m3 .水库建成后,在不取水情况下可连续68天正常供应优质长江原水,有效防止咸潮影响本市供水水质,其中11m3优质水供应长兴岛居民,700多万m3供应中心城区市民。上海大润港务建设集团有限公司承揽近1.5公里大堤施工,合同金额近7000万。该工程由江底软地基处理、充填袋装砂堤身、上部护面结构等3部分组成。工况条件复杂,施工条件艰苦。工程预期于2010年上半年结束。

 

    【工程图片】

 江侧护坡

 

 库侧护坡
   
Date〖2009-09-28〗    Read〖8302〗
 
Sent to friends Sent to friends   Print Preview Print Preview   Go Top Go Top
 
 
 
 
 
 
 
COPYRIGHT©2008  Shanghai Darun Port Construction Group Co.,Ltd    Add:16th floor Jinqiao Buiding, No.1389 Jinqiao Road,Shanghai    Tel:021-58777100
Shanghai Darun Port Construction Group Co.,Ltd    copyright 2008 By Darun.    Statistic: 

工信部备案号:沪ICP备13045817号-1    沪公网安备 31011502002599号