中文版 English      
 
Entriprise culture
Staff charisma
Internal Publications
Billboard
DaRun Window
   Search engine
Title Text
   New projects
Salvage Project of Helios 3 Wreck
Bid Section I of the Waterway Maintenance Project (Phase 2) for the Puyang River from the Yaogongbu Bridge to Xintingbu, Zhuji City
Relocation Project of Bid Section 1 of the Port for Traffic between Land and Island at Aojiang, Pingyang County
The Wharf at the South Bank and Part of the Revetment Works of Gaoting Central Fishing Harbor at Daishan County
Reinforcement and Modification Project of Guoju Qidu Port
The Shijing Fishery Quay Extension Project for Taiwan use only at Nan’an City
Technical Reforming Project at the Gangzhangwan Passenger Dock at Ningde (water engineering part)
Daqu Grade 1 Fishing Harbor Construction Project at Daishan County
Zhoushan Base Port Project
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D41-D42
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D29
Emergency handling of Daixiang No. 1
Salvage of Taiwanese Wreck
Salvage of Wrecks during Typhoon Period
Salvage of Wreck Ruijiang No. 6
Early Phase Project of Jintang Dapukou Container Dock
Land Formation Project of Zhuangyuan’ao Container Dock in Wenzhou
Cast-in-situ Bored Pile Installation of Aoshan Transfer Base Oil Storage Tank Foundation in Zhoushan under CNPC (China National Petroleum Corporation)
Improvement Project along the East Sea area in Xiamen
Sediment Dredging, Riprap and Accropode Placement Project of Deep Water Channel Improvement Phase III at the Yangtze River Estuary
Improvement Project of a Smelly Black River Channel of Zhangjialu Port in Zhuqiao Town
Xinliuhe Beach Nourishment and Installation of Accropodes of the Submerged Breakwater at Nanshatou Passage
Breakwater Project in the Western Area of Yangshan Deep Water Port
Land Formation Project (Phase I) of Utility Area and Comprehensive Energy Utilization Area of Xiaoyangshan Port
Qingcaosha Reservoir and Water Intake & Transfer Pump Brake Project
East Breakwater and Land Formation Project of Beilun Container Dock Phase IV in Ningbo Port
Breakwater Project of Merchants International Daxie Terminals
Mud Blowing Project of the Pilot Area of Wenzhou High-Tech Industrial Base for Private Economy
Construction Contract Section II of Reclamation in the Southern Part of Leqingwan Port Phase I
Hydraulic Filling Project of Diaolang Reclamation Area in Zhoushan City
Dredging Project of Yangshan Deep Water Port Phase I
2 × 50,000-ton-class General Berth Extension Project of Longkou Port in Shandong Province
100,000-ton-class Channel Project of Longkou Port in Shandong Province
Dredging and Maintenance Project of Beisha Port (from Jianchuan Road Bridge to Estuary of the Huangpu River) under Shanghai Municipality On The Administration Of Waterway Transportation
Dock Dredging (bid section 1) and Waterfront Construction for Yangshan Oil Storage Project
300,000-ton-class Crude Oil Dock Dredging Project of Cezi Isle Oil Depot of Nanjing Oil Transportation Department
Shenjiamen Port Dredging Project (bid section II) of Putuo District, Zhoushan City
Dredging and Maintenance Project (bid section II) of the Yunzaobang Channel (Baoshan Section)
Channel Improvement Project of Shunde Waterway and Ganzhu Waterway in Guangdong Province
Coal Dock Dredging Project of Ningbo Beilun Power Plant
Renovation & Extension Project of Upstream Mooring Dolphins of Huai’an No.1 Ship Lock
Water Engineering Project of Ningbo Maritime Supervision Base under Zhejiang Maritime Safety Administration
Water Engineering Project of Zhoushan Maritime Supervision Base under Zhejiang Maritime Safety Administration
Phase I Project of Dongdian Level-2 Fishing Port at Jinshang Town, Shishi City, Fujian Province
3,000-ton-class Berth Extension Project of Zhoushan COFCO
Outfitting Dock Construction Phase 1 and Approach Bridge Project of Funing Shipbuilding Co., Ltd. in Fujian Province
No.2 Outfitting Dock Project Phase II of Tsuneishi Group (ZHOUSHAN) Shipbuilding Inc. (TZS)
Precast Yard Dock Project of CCCC Third Harbor Engineering Co., Ltd.


Making friends through every single project
     DARUN honour(quality)
   Human resources
 
 
 
   A subsidiary of Dynamic 
Friendly link
Ministry of Transport of the People's Republic of China
Ministry of Housing and Urban-Rural Development of the People's Republic of China(MOHURD)
Water Transport Construction Industry Association
China Dredging Association
Maritime Safety Administration People's Republic of China
Shanghai Maritime Safety Administration
Zhejiang Maritime Safety Administration
Shandong Maritime Safety Administration
 
 
 
勇往直前,奋斗不息——记唐山湾项目部的实习生活
   
 
  7月11日,按照公司的规定,我随公司领导到唐山湾项目部进行为期十天的实习生活。到达项目部的时候已是夜晚十一点,虽然临近午夜,我们仍然受到了项目部全体人员的热情接待,一路的舟车劳顿在一片欢声笑语中荡然无存。项目部工作人员的热情与体贴,让我感觉到了家的温暖,也使我对这次的实习生活充满了期待。
  经过一夜的休息,第二天一早,我随公司的面包车经过二十分钟的旅程到达了我们的施工区域。现场进行着紧张而有序的生产,排泥管口的泥汹涌而出,像极一道瀑布,其景蔚为壮观,此情此景使我联想到我们大润的企业文化与大润人的精神:勇往直前,奋斗不息。吹填项目较之于结构工程相对简单,但仍然需要我们全身心的投入才能做好,现场的工人对排泥管进行着细致的检查,看管线有无漏洞,他们敬业的精神,值得我们好好学习。在现场,技术员胡彬给我大致介绍了这个工程的概况:唐山湾国际旅游岛湖心岛工程于7月2日正式开工,按照合同规定我们的疏浚方量不低于120万立方米,现场的施工区域分为三块,目前我们进行的是第三块区域的吹泥工作,目前施工的是公司大润1号船,如果正常工作一天的吹泥量可达到1万立方左右。通过一个上午的观察和听述项目部人员的讲解,使我对这个工程有了初步的认识,也使我对疏浚工程有了更为深刻的理解。回去的时候出现了一个意外的小插曲:由于现场是通过吹泥围填起来的,我们的车不小心陷了进去,项目部领导带头下来推车,虽然大家被淤泥弄脏了鞋袜却没有一句抱怨,这温馨的一幕让我感到了项目部生活的和谐。
  接下来的一个星期,我们每天都去现场了解情况。测量员定时对吹泥区的标高进行测量以便及时掌控项目进度,项目负责人带着我们对围堰进行细致的观察,看围堰是否发生缺口、能否承受淤泥的压力以及排水口是否能正常排水。7月16日,为了方便1号施工区与2号施工施工时排水顺利,项目部对施工方案进行了修改,施工范围从3号区调整到2号区,因为2号区离施工船更远,因此需要加接管线。当运管线的车辆和吊车到达现场后,却遇到了一个难题:因管线工人回去吃饭,现场不能进行卸管,而吊机急着赶到另一个工地。此时,项目部人员像事先商量好了似的,小心翼翼地爬上了运输管线的车辆,将吊车挂钩慢慢地挂到管线上,经过一个小时奋斗,全车管线顺利卸载。虽然这不是项目部人员的事情,但是大家本着把事干好、提高效率的原则,不辞辛劳,这才是大润人拼搏与奉献的精神,也是我们年轻人需要艰苦奋斗的精神。
  时光荏苒,实习的生活很快要结束了,虽然项目部的生活条件艰苦,业余生活也相对乏味,但是我却受益匪浅,除了学到了疏浚工程专业的技能知识,更是真切的感受到了项目部员工苦中作乐的乐趣与团结一心奋发向上的激情,有了这股激情,我们大润一定能走得更远、更强!(经营部 谭建华)
   
Date〖2012-08-03〗    Read〖5585〗
 
Sent to friends Sent to friends   Print Preview Print Preview   Go Top Go Top
 
 
 
 
 
 
 
COPYRIGHT©2008  Shanghai Darun Port Construction Group Co.,Ltd    Add:16th floor Jinqiao Buiding, No.1389 Jinqiao Road,Shanghai    Tel:021-58777100
Shanghai Darun Port Construction Group Co.,Ltd    copyright 2008 By Darun.    Statistic: 

工信部备案号:沪ICP备13045817号-1    沪公网安备 31011502002599号