中文版 English      
 
Entriprise culture
Staff charisma
Internal Publications
Billboard
DaRun Window
   Search engine
Title Text
   New projects
Salvage Project of Helios 3 Wreck
Bid Section I of the Waterway Maintenance Project (Phase 2) for the Puyang River from the Yaogongbu Bridge to Xintingbu, Zhuji City
Relocation Project of Bid Section 1 of the Port for Traffic between Land and Island at Aojiang, Pingyang County
The Wharf at the South Bank and Part of the Revetment Works of Gaoting Central Fishing Harbor at Daishan County
Reinforcement and Modification Project of Guoju Qidu Port
The Shijing Fishery Quay Extension Project for Taiwan use only at Nan’an City
Technical Reforming Project at the Gangzhangwan Passenger Dock at Ningde (water engineering part)
Daqu Grade 1 Fishing Harbor Construction Project at Daishan County
Zhoushan Base Port Project
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D41-D42
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D29
Emergency handling of Daixiang No. 1
Salvage of Taiwanese Wreck
Salvage of Wrecks during Typhoon Period
Salvage of Wreck Ruijiang No. 6
Early Phase Project of Jintang Dapukou Container Dock
Land Formation Project of Zhuangyuan’ao Container Dock in Wenzhou
Cast-in-situ Bored Pile Installation of Aoshan Transfer Base Oil Storage Tank Foundation in Zhoushan under CNPC (China National Petroleum Corporation)
Improvement Project along the East Sea area in Xiamen
Sediment Dredging, Riprap and Accropode Placement Project of Deep Water Channel Improvement Phase III at the Yangtze River Estuary
Improvement Project of a Smelly Black River Channel of Zhangjialu Port in Zhuqiao Town
Xinliuhe Beach Nourishment and Installation of Accropodes of the Submerged Breakwater at Nanshatou Passage
Breakwater Project in the Western Area of Yangshan Deep Water Port
Land Formation Project (Phase I) of Utility Area and Comprehensive Energy Utilization Area of Xiaoyangshan Port
Qingcaosha Reservoir and Water Intake & Transfer Pump Brake Project
East Breakwater and Land Formation Project of Beilun Container Dock Phase IV in Ningbo Port
Breakwater Project of Merchants International Daxie Terminals
Mud Blowing Project of the Pilot Area of Wenzhou High-Tech Industrial Base for Private Economy
Construction Contract Section II of Reclamation in the Southern Part of Leqingwan Port Phase I
Hydraulic Filling Project of Diaolang Reclamation Area in Zhoushan City
Dredging Project of Yangshan Deep Water Port Phase I
2 × 50,000-ton-class General Berth Extension Project of Longkou Port in Shandong Province
100,000-ton-class Channel Project of Longkou Port in Shandong Province
Dredging and Maintenance Project of Beisha Port (from Jianchuan Road Bridge to Estuary of the Huangpu River) under Shanghai Municipality On The Administration Of Waterway Transportation
Dock Dredging (bid section 1) and Waterfront Construction for Yangshan Oil Storage Project
300,000-ton-class Crude Oil Dock Dredging Project of Cezi Isle Oil Depot of Nanjing Oil Transportation Department
Shenjiamen Port Dredging Project (bid section II) of Putuo District, Zhoushan City
Dredging and Maintenance Project (bid section II) of the Yunzaobang Channel (Baoshan Section)
Channel Improvement Project of Shunde Waterway and Ganzhu Waterway in Guangdong Province
Coal Dock Dredging Project of Ningbo Beilun Power Plant
Renovation & Extension Project of Upstream Mooring Dolphins of Huai’an No.1 Ship Lock
Water Engineering Project of Ningbo Maritime Supervision Base under Zhejiang Maritime Safety Administration
Water Engineering Project of Zhoushan Maritime Supervision Base under Zhejiang Maritime Safety Administration
Phase I Project of Dongdian Level-2 Fishing Port at Jinshang Town, Shishi City, Fujian Province
3,000-ton-class Berth Extension Project of Zhoushan COFCO
Outfitting Dock Construction Phase 1 and Approach Bridge Project of Funing Shipbuilding Co., Ltd. in Fujian Province
No.2 Outfitting Dock Project Phase II of Tsuneishi Group (ZHOUSHAN) Shipbuilding Inc. (TZS)
Precast Yard Dock Project of CCCC Third Harbor Engineering Co., Ltd.


Making friends through every single project
     DARUN honour(quality)
   Human resources
 
 
 
   A subsidiary of Dynamic 
Friendly link
Ministry of Transport of the People's Republic of China
Ministry of Housing and Urban-Rural Development of the People's Republic of China(MOHURD)
Water Transport Construction Industry Association
China Dredging Association
Maritime Safety Administration People's Republic of China
Shanghai Maritime Safety Administration
Zhejiang Maritime Safety Administration
Shandong Maritime Safety Administration
 
 
 
脚步丈量着使命 用心履行着责任——吉布提多哈雷项目部惠实2号船长孙开德
   
 

        6月,烈日当头,海外吉布提项目部,普通又平凡的一天即将开始。

       “有没有哪些活需要帮忙?”正在仔细询问船员、巡视船舶的是惠实2号船长孙开德,船员们早已经不知道他一天来回会巡视和检查几次船舶事宜,但大家心里都很清楚他每次巡视的心愿就是保证船舶行驶和生产安全并希望力所能及地帮助每一位船员。

       2008年就来到公司的孙开德一直奋斗在船舶生产的一线岗位,兢兢业业、任劳任怨,始终将船舶的安全和生产挂在心头,用强烈的责任意识和奉献精神,践行着一名大润人的绝对忠诚和责任担当。

务实 勇于担当
       “在船舶生产的一线,既要轰轰烈烈,又要脚踏实地,既要勇于创新,又要勇担责任。”对于船舶生产,孙开德是这么说的也是这么做的。

      非洲吉布提骄阳似火,室外温度高达40摄氏度以上,天气异常炎热,而吉布提多哈雷项目施工时间紧迫,惠实2号作为吉布提项目部主力施工船舶担当着“抛石”这一工序的重要任务。为了赶潮施工时间,吉布提项目部安排抛石作业在傍晚工作,体力消耗大,急需补充大量的能量。孙开德作为船舶的船长,率先带头以工作为重,没有一丝怨言,也从来没有和项目部提过“耽误吃饭”之类的唠叨。

       而在船舶顺利开到临时码头停靠,装石料的间隙,他也不会停下自己的脚步,他始终会在船上走走看看。“看看”船舶有没有哪些地方受损,“看看”是否需要更换桶装淡水,“看看”船上有没有杂活可以帮忙,“看看”船员是否情绪稳定……这些早已经成为他的生活日常。

细致 走进内心
       “船员的管理,是要走进他们的内心,切实为他们考虑问题,站在他们的角度去温暖他们。”一直作为船舶管理者的孙开德是这样思考船员管理问题。

       吉布提海外项目进展迅速离不开诸多船员的共同努力,而船员的稳定性也成了决定项目实施的一个重要因素之一。由于远离故土,思念家中的亲人,渴望同事之间的互相关心和关怀,成为吉布提一线船员的心中愿望。

       在这种认识下,孙开德船长从船员的吃、穿、住等最基本的地方入手,处处在细致工作中显现他作为一名老大哥对于船员的关心和关怀。

       惠实2号的铲车司机由于铲车问题在总包单位机修大院修理铲车,由于修理时间过长,怕这一名员工没有晚饭,他一连打了5个电话,询问维修的进展,确认维修完工的时间。最后,由于维修时间较长,该名员工未能及时至餐厅就餐,他还专门嘱咐食堂给这名员工留妥饭菜,并再次电话确认维修进展。


服从 绝对忠诚
       “船舶生产一定要服从大局,要以整个项目部的全局为念,将整个项目的利益摆在第一位。”孙开德始终以身作则开展大局观教育,消除部分船员的个人利己主义。

       部分船舶由于抢抓施工,会出现人手短缺的紧急情况,这个时候孙开德船长总是会第一时间对船员开展思想教育,及时安排惠实2号暂时无工作安排的船员去协助开展各项工作。

       有时由于项目部人手短缺,孙开德还会力所能及地协助项目部开展相关工作,他会不嫌麻烦地自行安排驾驶员驾驶皮卡去给惠实2号加油。

       孙开德船长作为吉布提海外项目中的代表和吉布提项目部的每一位员工一同开展多哈雷港口项目的各项施工作业。而在近期,吉布提项目部已完成水下整平工作,并已顺利验收。整平工作是吉布提基床抛石的最后一项工序,项目部也将继续进行沉箱安装、箱内抛石、箱后棱体倒滤层等相关工序的施工。

       相信在以孙开德他们为代表的吉布提项目,肯定会积极克服种种困难,最终高质量地完成吉布提多哈雷项目工程,为集团公司的发展树立又一块新的里程碑。

   
Date〖2016-09-08〗    Read〖3311〗
 
Sent to friends Sent to friends   Print Preview Print Preview   Go Top Go Top
 
 
 
 
 
 
 
COPYRIGHT©2008  Shanghai Darun Port Construction Group Co.,Ltd    Add:16th floor Jinqiao Buiding, No.1389 Jinqiao Road,Shanghai    Tel:021-58777100
Shanghai Darun Port Construction Group Co.,Ltd    copyright 2008 By Darun.    Statistic: 

工信部备案号:沪ICP备13045817号-1    沪公网安备 31011502002599号