中文版 English      
 
Party-masses relationship
Party Activities
Learning Corner
   Search engine
Title Text
   New projects
Salvage Project of Helios 3 Wreck
Bid Section I of the Waterway Maintenance Project (Phase 2) for the Puyang River from the Yaogongbu Bridge to Xintingbu, Zhuji City
Relocation Project of Bid Section 1 of the Port for Traffic between Land and Island at Aojiang, Pingyang County
The Wharf at the South Bank and Part of the Revetment Works of Gaoting Central Fishing Harbor at Daishan County
Reinforcement and Modification Project of Guoju Qidu Port
The Shijing Fishery Quay Extension Project for Taiwan use only at Nan’an City
Technical Reforming Project at the Gangzhangwan Passenger Dock at Ningde (water engineering part)
Daqu Grade 1 Fishing Harbor Construction Project at Daishan County
Zhoushan Base Port Project
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D41-D42
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D29
Emergency handling of Daixiang No. 1
Salvage of Taiwanese Wreck
Salvage of Wrecks during Typhoon Period
Salvage of Wreck Ruijiang No. 6
Early Phase Project of Jintang Dapukou Container Dock
Land Formation Project of Zhuangyuan’ao Container Dock in Wenzhou
Cast-in-situ Bored Pile Installation of Aoshan Transfer Base Oil Storage Tank Foundation in Zhoushan under CNPC (China National Petroleum Corporation)
Improvement Project along the East Sea area in Xiamen
Sediment Dredging, Riprap and Accropode Placement Project of Deep Water Channel Improvement Phase III at the Yangtze River Estuary
Improvement Project of a Smelly Black River Channel of Zhangjialu Port in Zhuqiao Town
Xinliuhe Beach Nourishment and Installation of Accropodes of the Submerged Breakwater at Nanshatou Passage
Breakwater Project in the Western Area of Yangshan Deep Water Port
Land Formation Project (Phase I) of Utility Area and Comprehensive Energy Utilization Area of Xiaoyangshan Port
Qingcaosha Reservoir and Water Intake & Transfer Pump Brake Project
East Breakwater and Land Formation Project of Beilun Container Dock Phase IV in Ningbo Port
Breakwater Project of Merchants International Daxie Terminals
Mud Blowing Project of the Pilot Area of Wenzhou High-Tech Industrial Base for Private Economy
Construction Contract Section II of Reclamation in the Southern Part of Leqingwan Port Phase I
Hydraulic Filling Project of Diaolang Reclamation Area in Zhoushan City
Dredging Project of Yangshan Deep Water Port Phase I
2 × 50,000-ton-class General Berth Extension Project of Longkou Port in Shandong Province
100,000-ton-class Channel Project of Longkou Port in Shandong Province
Dredging and Maintenance Project of Beisha Port (from Jianchuan Road Bridge to Estuary of the Huangpu River) under Shanghai Municipality On The Administration Of Waterway Transportation
Dock Dredging (bid section 1) and Waterfront Construction for Yangshan Oil Storage Project
300,000-ton-class Crude Oil Dock Dredging Project of Cezi Isle Oil Depot of Nanjing Oil Transportation Department
Shenjiamen Port Dredging Project (bid section II) of Putuo District, Zhoushan City
Dredging and Maintenance Project (bid section II) of the Yunzaobang Channel (Baoshan Section)
Channel Improvement Project of Shunde Waterway and Ganzhu Waterway in Guangdong Province
Coal Dock Dredging Project of Ningbo Beilun Power Plant
Renovation & Extension Project of Upstream Mooring Dolphins of Huai’an No.1 Ship Lock
Water Engineering Project of Ningbo Maritime Supervision Base under Zhejiang Maritime Safety Administration
Water Engineering Project of Zhoushan Maritime Supervision Base under Zhejiang Maritime Safety Administration
Phase I Project of Dongdian Level-2 Fishing Port at Jinshang Town, Shishi City, Fujian Province
3,000-ton-class Berth Extension Project of Zhoushan COFCO
Outfitting Dock Construction Phase 1 and Approach Bridge Project of Funing Shipbuilding Co., Ltd. in Fujian Province
No.2 Outfitting Dock Project Phase II of Tsuneishi Group (ZHOUSHAN) Shipbuilding Inc. (TZS)
Precast Yard Dock Project of CCCC Third Harbor Engineering Co., Ltd.


Making friends through every single project
     DARUN honour(quality)
   Human resources
 
 
 
   A subsidiary of Dynamic 
Friendly link
Ministry of Transport of the People's Republic of China
Ministry of Housing and Urban-Rural Development of the People's Republic of China(MOHURD)
Water Transport Construction Industry Association
China Dredging Association
Maritime Safety Administration People's Republic of China
Shanghai Maritime Safety Administration
Zhejiang Maritime Safety Administration
Shandong Maritime Safety Administration
 
 
 
不忘初心·牢记使命——上海大润党总支、机关支部、海工支部联合开展七一主题党日活动
   
 

       

        

       

       

    6月22日,在迎接中国共产党建党98周年之际,上海大润党总支、上海大润机关支部、大润海工支部至陈云故居暨青浦革命历史纪念馆联合开展“不忘初心 牢记使命”主题党日活动,瞻仰伟人风采、感受先辈精神、缅怀党的优良传统。
       展示厅内一张张生动的图片,一幅幅逼真的场景,一篇篇珍贵的文献,一件件感人的实物,真实地记录了陈云同志的人生轨迹,清晰地展现了陈云同志的深邃思想。通过聆听陈云同志光辉的一生及其丰功伟绩,我们回顾、重温了党的辉煌历史和奋斗历程,接受了党的洗礼,受到了强烈的震撼。
       故人远去,其音犹在。“适合老百姓的要求,做了一点事,如此而已”,这一句最朴实的话语概述了老一辈革命家陈云同志精彩的一生。作为新中国社会主义经济建设的开创者和奠基人之一,无论在建国初期、三年自然灾害时期,还是党的十一届三中全会以来,陈云同志始终坚持按经济规律办事,努力探索,积极学习国外经济建设的成功经验,为我国的经济建设作出了卓越贡献。
       “不唯上,不唯书,只唯实,交换、比较、反复”,简短精悍的15字,浓缩了唯物论、辩证法的精华,是陈云同志学习马克思主义的深刻体会,与毛泽东同志的实事求是原则一脉相承,与邓小平同志的解放思想、实事求是精神完全一致。陈云同志不仅总结出这15字原则,而且穷其一生实践着它。
       伟人已逝,精神永存。陈云同志交换、比较、反复的工作方法对我们仍有着现实指导意义。一是要从实际出发,实事求是地研究处理问题。二是广泛听取各种意见,从而对事物有一个全面的符合实际的理解,避免看问题的片面性。要经常注意同别人交换意见,尤其是多倾听反面的意见。
       当前,在新时代下,我们要继承和发扬陈云同志实事求是、善于思考、勇于创新的精神,要倾听群众的呼声,在劈波斩浪中开拓前进,在攻坚克难中创造业绩,为实现大润成为“一流水工企业”的目标,为实现中华民族伟大复兴的中国梦而更加努力奋斗。  

   
Author〖大润企业综合办〗    Date〖2019-07-12〗    Read〖5641〗
 
Sent to friends Sent to friends   Print Preview Print Preview   Go Top Go Top
 
 
 
 
 
 
 
COPYRIGHT©2008  Shanghai Darun Port Construction Group Co.,Ltd    Add:16th floor Jinqiao Buiding, No.1389 Jinqiao Road,Shanghai    Tel:021-58777100
Shanghai Darun Port Construction Group Co.,Ltd    copyright 2008 By Darun.    Statistic: 

工信部备案号:沪ICP备13045817号-1    沪公网安备 31011502002599号