Outfitting Dock Construction Phase 1 and Approach Bridge Project of Funing Shipbuilding Co., Ltd. in Fujian Province |
|
|
|
|
【Project Overview】 This project, conducted by Shanghai Darun Port Construction Group Co., Ltd., consisted of construction of 5,000-ton-class bulk cargo terminal (also used for outfitting of 6,800-ton-class and 20,000-ton-class oil tankers). The project mainly consisted of construction of dock and trestle bridges. 600mm x 600mm prestressed square piles were used for the pile foundation of the terminals; 600mm x 600mm prestressed square piles and 800mm bored piles for the pile foundation of the trestle bridge; a 1,000 mm steel pipe pile was used as a fender pile. It was a pile-supported dock with a pile cap of slab beam structure.
【Project Picture】 |
|
Driving the first pile in the early phase of the project |
|
|
Panoramic view of the dock under construction | |
|
|
|
|