【Project Overview】 This extension project was designed with an annual throughput capacity of 2 million tons. Shanghai Darun Port Construction Group Co., Ltd. performed the dredging work of the basin and berths, with a total dredging quantity of 0.5 million m3.
| |
【Project Picture】 Unavailable |
|
|