【Project Overview】This project is undertaken by Shanghai Darun Port Cons-truction Group Co., Ltd., to dredge the SE-2 of the east breakwater of Dongjiakou Harbor. It is located inside the Dongjiakou harbor to dredge and remove around 700,000 m3 mud within 75 days.
|