Introduction of the Zhoushan Marine Engineering Supply Base

 

1Project Investor: Shanghai Darun Port Construction Group Co., Ltd

2Construction Company:Zhoushan Darun Channel Construction Co., Ltd.

3Project Name: Zhoushan Darun Channel Construction Co., Ltd. Working Ship Base Supporting Facilities Project

4. Project Site: Reclamation Area (Putuo Harbour Ecological Industry Zone) Fulimen, Zhujiajian, Putuo District, Zhoushan (Phase I)

5. Land Area: 48, 666m2 (73 mus)

6. Coast Line: 200m

7. Sea Area 4.8998 hectares (ha). 

8. Project Scope: total construction area of 30,000m2, including office building 6,000 m2 , warehouse and auxiliary building 24,000 m2, a wharf (length 190m and width 20m) exclusive for 2,000-ton-class above working ships, an approach bridge (134.2m l x 7.5m w), and wharf supporting facilities.

9. Project Investment Total Sum RMB 200 million.

      

Picture of Showing Original Landform of Zhujiajian Project 

the picture of the finished base terminal

the savvio picture of the Zhoushan Marine Engineering Supply Base


 