Hydraulic Filling Project of Diaolang Reclamation Area in Zhoushan City

 
  

Project Overview Located in the Diaolang Reclamation Area between Langxi Mountain of Baiquan Town, and Diao Mountain of Beichan Town, in the north of Dinghai District, Zhoushan City, this project covered an area of 7,392 mus. Hydraulic mud/sand filling and soil/rock backfilling technology were applied to this project based on area difference, including an earth volume of 3.6 million m3, sand volume of 15.1 million m3, earth/rock volume of 2.03 million m3  for road construction, and backfilled waste slag volume of 2.61 million m3. The total investment of this project totaled RMB 725 million. Shanghai Darun Port Construction Group Co., Ltd. performed hydraulic sand filling of this project.

 

    Project Picture

Land areas under Hydraulic Filling

 
Date〖2009-12-25〗    Read〖5473〗
Sent to friends Print Preview Go Top Close
COPYRIGHT©2008  Shanghai Darun Port Construction Group Co.,Ltd  Add:16F Jinqiao Buiding, No.1389 Jinqiao Road,Shanghai  Tel:021-58777100